New Construction in Kennesaw, GA
We handle new construction roofing in Kennesaw for home builders and for owners building their own place, on a written scope and a dry-in date we commit to. If you are looking for a roofer in Kennesaw who will show up the week the deck is ready, that is the job we do.

New construction roofing in Kennesaw, built to the shingle maker’s spec
On a new home the work is designed-in ventilation, valley protection, step and kick-out flashing, and correct nailing — done to manufacturer specification because that is what the warranty is conditional on. Planning penetrations with the other trades before they start cutting is far cheaper than chasing leaks around them later.
What goes on a new Kennesaw roof, in order
People ask what they are paying for on a new roof, so here is the order we install in. Each step has a reason, and skipping one is how a new house ends up with a leak in its first year.
- Deck check after the framers leave. Loose or damaged sheets get fixed before anything covers them.
- Drip edge at the eaves, then underlayment, then drip edge up the rakes so water always runs over the joint.
- Leak barrier in the valleys and around every pipe, vent and chimney chase.
- Starter strip at eaves and rakes, so the first row of shingles is sealed at the edge.
- Shingles nailed on the maker's nail line, with step flashing woven in at every wall.
- Kick-out flashing where a roof edge dies into a wall, so water is pushed into the gutter instead of down the siding.
- Ridge vent, cut to match the soffit intake so the attic actually breathes.
- Magnetic nail sweep of the lot before we leave, because other trades and the owner walk that dirt next.
Kennesaw's building boom and the roofs it left
Kennesaw's median home was built in 1998 according to the Census 2020 to 2024 estimates, and roughly 65 percent of homes are owner-occupied. A big share of the roofs we repair here came from fast production building in the late 1990s and 2000s. The trouble spots repeat: missing kick-out flashing, ridge vents with no real soffit intake, and pipe boots that cracked early. We build new houses so the next roofer who walks that roof in twenty years finds none of that.
Working near the mountain
Kennesaw Mountain National Battlefield Park covers close to 3,000 acres on the edge of town, and plenty of lots near it carry mature hardwoods. If yours does, we will talk about algae-resistant shingles on the shaded side and extra valley protection under the trees.
Kennesaw's permitting process
The City of Kennesaw operates its own Building Services department and requires all permit applications to be submitted online, with a defined certificate-of-occupancy checklist at the end of the process. If the site sits within the historic district there is an ordering requirement worth knowing before the schedule is set: the Certificate of Appropriateness must be approved before the building permit application is made, and it applies to any exterior work. On a new build that is not a detail to discover late.
Questions Kennesaw homeowners ask us
Through the City of Kennesaw's own Building Services department, with online-only applications and a certificate-of-occupancy checklist at completion.
The Certificate of Appropriateness has to be approved before the building permit application — not alongside it. Worth building into the schedule rather than discovering it at the counter.
That is the commitment. We schedule against the framing inspection rather than a hopeful date, because everything after us depends on the house being closed to weather.
Yes, vents and other penetrations are much easier to flash properly when they are planned before the roof goes on than when they are cut in afterward.
A small bent piece of metal at the bottom of a roof edge that runs into a wall. It turns water into the gutter instead of letting it run down behind the siding. It is cheap, it is easy to forget, and leaving it out causes some of the worst hidden rot we see.
Yes, we run a magnetic nail sweep across the lot and driveway before we leave so the next crew and the owners are not picking roofing nails out of tires.